The Core, Guys & St Thomas’s Hospital Trust

View Gallery
Client Guys and St Thomas Hospital Trust (GSTT)
Value Undisclosed
Contract NEC
Project Manager Mace
Architect ADP
Main Contractor Morgan Sindall
M&E Consultant Mott McDonald

A new build five-storey development located to the south of the main St Thomas’ Hospital campus, the Core is a mixed patient clinical services and medical education facility for Evelina London Children’s Hospital due to hand over in late 2022.

Due to the nature of the site being a live hospital, careful consideration has had to be made to planning and sequencing of works on this project.  MSL have worked closely with Morgan Sindall to ensure that all deadlines are achieved on time and completed in line with the HTM’s.

Detailed surveys were completed before we stepped foot on site to ensure that MSL fully understood the logistics and service routes of the existing hospital and services which were due to feed the new building.

 

Project Highlights:

– Inert Gas Fire Suppression System for LV Switchrooms

– Tank Fed, Pumped Sprinkler System with Pre-Action Values on Operating Theatres

– Medical Gas Installation

– New Chilled Water Installation

– Hybrid CHP & Constant Temperature Heating System

– New Cold-Water Main with Chlorine Dosing

– Integration into the hospitals BMS network

– Central Core Smoke Ventilation System

– Two new HV Transformers located on the Roof plant room of the building serving A & B switchboards

– All LV Distribution systems, including Essential/Non-Essential Power for Life Safety Systems

– Essential & Life Safety Standby Diesel Generator

– IPS/UPS Systems for 2no. Operating Theatres

– Medical Pendants and Surgeons Panels

– Access Control & CCTV Systems

– Nurse Call Systems

– Wireless Lighting Control System with Emergency Monitoring