Barnet Copthall & New Barnet Leisure Centres

View Gallery
Client London Borough of Barnet
Value £7.85M
Contract JCT Design & Build 2016
Project Manager Capita
Architect Saunders Boston
Main Contractor Graham Construction
M&E Consultant Brydon Wood

We completed the M&E installations to two brand new leisure centres in 2019, both running concurrently and reaching practical completion September 2019 for Graham Construction.

Barnet Copthall Leisure Centre is a newly constructed £24M leisure complex located in Champions Way.  The modern health hub, which replaces a previously outdated centre contains three swimming pools, with provision for 200 spectators, a large sports hall, exercise studios, a state-of-the-art Health & Fitness suite and three health improvement rooms.

New Barnet Leisure Centre replaced the existing enclosed Lido on to a new site.  The facility contains a 25m, 6 lane Community swimming pool, a Learner pool, a state-of-the-art Fitness Suite with 85 stations, 2 Exercise Studios, Outdoor Tennis Courts, and a Café with a Spectator Seating area.

The projects strived to reduce carbon emissions utilising a combination of condensing gas-fired boilers, air source heat pumps, Combined Heating & Power (CHP) units, energy efficient LED lighting & Photovoltaic (PV) Panels.

For more information about Barnet Copthall Leisure Centre please click here

 

Project Highlights:

– A Gas Fired CHP Unit

– Local VRF Systems for Fitness Centre Cooling

– Gas-Fired Condensing Boilers

– BMS Controls

– GRP Electrical Containment systems suitable for use within Swimming pools

– Fire & Disabled Refuge Alarm Systems

– Internal/External LED Lighting, Emergency Lighting & Lighting Control Systems

– Electric Car Charging Stations with future Infrastructure for additional stations

– Photovoltaic (PV) Systems